Magnusson Klemencic Associates Foundation
Historical funder research: IRS Form 990-PF filings from US private foundations, showing who funded what in past years. This is not a list of currently open grant calls, and we do not track open RFPs from private foundations. From public IRS Form 990-PF filings (latest on file for this funder: tax year 2025). Coverage: tax years 2019–2025. Freshness: the IRS releases these returns 1.5–2+ years after the tax year ends, so 2025 is still partial and a funder's newest grants may not appear yet. Last updated: November 14, 2026. Filings can contain errors, so confirm current priorities and deadlines with the funder before applying.
Year 2025 is still partial because many returns have not been filed or released yet. That is a freshness issue — coverage in our dataset is tax years 2019–2025.
Only 12.5% of this funder's organizational grants could be linked to an IRS cause code.
- Form & materials
- Research Topic Applcaiton: Topic how the research will meet the misison of the Foundation and need of the indsutry proposed reasearch dissemination plan principal investigator industry support proposed timing funding request contact information.
- Deadlines
- None
- Restrictions
- Must support the mission of the Foundation and the industry.
| Recipient | Location | Purpose (as filed) | Amount | Tax yr |
|---|---|---|---|---|
| 2030 Inc Architecture 2030 Inc | Santa Fe, NM | A-105: Climate Positive Design for the Exterior Built Environment: Identify gaps areas for usage improvemet and integration with the existing Pathfinder tool and existing dataset. Update the tool with currently existing planning and landscape datasets as well as basic civil materials. Execute tool interface and output advancement capabilities. | $50,000 | 2025 |
| West Virginia University Foundation | Morgantown, WV | This project investigates a supplemental damping system for a floor system long-span truss or stadium raker among other options. The testing involves vibration analysis to confirm anticipated performance. | $30,000 | 2025 |
| Charles Pankow Foundation | Haymarket, VA | RGA 01-25: Behavior of Modular Steel Plate Floor Assemblies: This project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the AISC Need for Speed initiative to reduce the time from conception to occupancy for steel building structures. | $25,000 | 2025 |
| Charles Pankow Foundation | Mclean, VA | RGA #04-23 Steel Mass Timber Hybrid Diaphragms and Vibration: aims to investigate the diaphragm and vibration behavior of steel-cross laminated timber CLT floors. This research will catalyze innovation within the building construction field by enabling efficient and effective designs of steel-CLT floors. Steel-CLT buildings are currently being constructed throughout the US. However the existing design guides for diaphragm and vibration design have not been developed through experimental data. Therefore the design of steel-CLT buildings may be overly conservative. | $22,500 | 2025 |
| Charles Pankow Foundation | Haymarket, VA | RGA 03-23:Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. This is the next phase after RGA 01-22. | $0 | 2025 |
| Charles Pankow Foundation | Mclean, VA | RGA -5-22 Performance based structural fire design for authorities having jurisdiction officials: this project will develop educational training materials to introduce AJH to the topic of performance-based structural fie design pbsfd. These materials will assist AHJ to gain an understanding of the goals objectives fire scenarios thermal and structural analyses for pbsfd. After completing the training ahj will be able to review pbsdf designs along with their assumptions limitations can caveats. They will be able to effectively manage relationships between the engineering team and the peer review panel and make final decisions based on buildings codes for steel concrete masonry and wood structures. The educations materials will include slides recorded presentations guideline documents recordings of live workshops seminars and discussions by expert panels in the field of structural fire engineering fire protection engineering and performance-based design. | $0 | 2025 |
| Charles Pankow Foundation | Mclean, VA | rga 01-22 Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. | $0 | 2025 |
| Building Transparency | Seattle, WA | A-104 The carbon results framework project: the goal of the ec3 tool project is to transform building construction by transparently measuring comparing and reducing embodied carbon emission from construction materials. each year the built environment contributes almost 40% of co2 emission worldwide and it is estimated that there will be a doubling of the amount of building floorspace in the next 40 years. at least half of the carbon footprint of these new building will take the form of embodied carbon in the emissions associated with the building construction including extracting transporting manufacturing and installing building materials. as a result owners designers engineers and contactors are turning their attention to building material seeking information on these products so they can make informed smart choices. the ec3 tool would enable the building industry to easily access and view material carbon emissions data. | $0 | 2025 |
| Charles Pankow Foundation | Mclean, VA | RGA 02-21 This research seeks to develop and experimentally validate bolded splice details for composite plate shear walls-concrete filled CPSW-CF to enable nationwide application of this structural system. The use of CPSW-CF structures leverage steel pre-fabrication in the shop and stay-in-place formwork to reduce the time spent on site and accelerates the construction schedule. Professor Bruneau from the University of Buffalo serves as the principal investigator. | $0 | 2025 |
| Charles Pankow Foundation | Haymarket, VA | RGA 03-23:Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. This is the next phase after RGA 01-22. | $50,000 | 2024 |
| 2030 Inc Architecture 2030 Inc | Santa Fe, NM | A-105: Climate Positive Design for the Exterior Built Environment: Identify gaps areas for usage improvemet and integration with the existing Pathfinder tool and existing dataset. Update the tool with currently existing planning and landscape datasets as well as basic civil materials. Execute tool interface and output advancement capabilities. | $50,000 | 2024 |
| Charles Pankow Foundation | Mclean, VA | rga 01-22 Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. | $31,250 | 2024 |
| Building Transparency | Seattle, WA | A-104 The carbon results framework project: the goal of the ec3 tool project is to transform building construction by transparently measuring comparing and reducing embodied carbon emission from construction materials. each year the built environment contributes almost 40% of co2 emission worldwide and it is estimated that there will be a doubling of the amount of building floorspace in the next 40 years. at least half of the carbon footprint of these new building will take the form of embodied carbon in the emissions associated with the building construction including extracting transporting manufacturing and installing building materials. as a result owners designers engineers and contactors are turning their attention to building material seeking information on these products so they can make informed smart choices. the ec3 tool would enable the building industry to easily access and view material carbon emissions data. | $25,000 | 2024 |
| Charles Pankow Foundation | Mclean, VA | RGA 02-21 This research seeks to develop and experimentally validate bolded splice details for composite plate shear walls-concrete filled CPSW-CF to enable nationwide application of this structural system. The use of CPSW-CF structures leverage steel pre-fabrication in the shop and stay-in-place formwork to reduce the time spent on site and accelerates the construction schedule. Professor Bruneau from the University of Buffalo serves as the principal investigator. | $20,000 | 2024 |
| Charles Pankow Foundation | Mclean, VA | RGA #04-23 Steel Mass Timber Hybrid Diaphragms and Vibration: aims to investigate the diaphragm and vibration behavior of steel-cross laminated timber CLT floors. This research will catalyze innovation within the building construction field by enabling efficient and effective designs of steel-CLT floors. Steel-CLT buildings are currently being constructed throughout the US. However the existing design guides for diaphragm and vibration design have not been developed through experimental data. Therefore the design of steel-CLT buildings may be overly conservative. | $12,500 | 2024 |
| Charles Pankow Foundation | Mclean, VA | RGA -5-22 Performance based structural fire design for authorities having jurisdiction officials: this project will develop educational training materials to introduce AJH to the topic of performance-based structural fie design pbsfd. These materials will assist AHJ to gain an understanding of the goals objectives fire scenarios thermal and structural analyses for pbsfd. After completing the training ahj will be able to review pbsdf designs along with their assumptions limitations can caveats. They will be able to effectively manage relationships between the engineering team and the peer review panel and make final decisions based on buildings codes for steel concrete masonry and wood structures. The educations materials will include slides recorded presentations guideline documents recordings of live workshops seminars and discussions by expert panels in the field of structural fire engineering fire protection engineering and performance-based design. | $0 | 2024 |
Grants to individuals are counted but not named.
The free funder search finds foundations that funded organizations like your client's, by cause and location. Free templates: multi-client grant calendar, grant tracker. GrantCorral is a workspace for grant consultants with several clients; founding members get 60 days free on Consultant, no card required, then 50% off the first year if they stay.